Open Access
Fig. 3

Download original image
The control panel of the kiln during the first 5-day dehydration cycle with the solar dryer system installed in San Cono, Sicily.
The control panel of the kiln during the first 5-day dehydration cycle with the solar dryer system installed in San Cono, Sicily.